Jun. 30th, 2013

vaneramos: (Default)
Tour de Fleece
For the Tour de Fleece I wanted to get a little actual spinning in on the first day, so last night I hand carded the first rolag and spun it before bed. Then I got up and did two more.

Each of the 75 packages I showed yesterday contains 4g of fibre. As I go, I weigh half of each, make a 2g rolag and spin it, saving the other half for the seond ply. In this way the colour gradations for the two plies should line up.

So I have 72 packages to go, and that's only half of it. It took me half an hour to spin two. We're supposed to spin at least 15 minutes a day for the Tour de Fleece, which works out perfectly.

I'm calling this project the autumn diamonds scarf.

Profile

vaneramos: (Default)
vaneramos

August 2017

S M T W T F S
  12 345
6789101112
1314 151617 1819
20 21 22 23242526
2728293031  

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 13th, 2026 03:56 am
Powered by Dreamwidth Studios